Pick List Report |
Top Previous Next |
The Pick List Report is accessed from the Reports Window, Project Management folder and acts similar to a shipping ticket in that Components are grouped by Ship-To location within each Project to assist in proper delivery.
A Project Code must be entered for which to print the Pick List Report. The report will display Components based upon one of the five choices in the Selection menu:
Ranges for Ship-To Codes, Vendors, and Locations are available to optionally narrow the scope of the report. Further, each Component Type, not including Merchandise, can be optionally excluded from the Pick List Report to prevent Components that represent goods or services that do not require shipping to keep the document as concise as possible.
|